2
1
2
4
1. | Front bagger tube | 3 | |
2. | Lower bagger tube | ||
|
3.1/4 x 50,8mm Carriage Bolts
4.1/4 Lock nut
5
3
To Assemble Bagger
NOTE: For ease of assembly, you may wish to obtain the assistance of another person when putting the bagger to- gether.
• Holes in front bagger tube are at an angle. Place front |
bagger tube against lower bagger tube and check for |
proper hole alignment before assembling bolts. |
• Assemble front and lower bagger tubes using four (4) |
1/4 x 50,8mm carriage bolts and lock nuts supplied. |
Tighten securely. |
• Slide front and lower bagger tube assembly into the bag- |
ger assemby. |
• Assemble front and upper bagger tubes using four (4) |
1/4 x 50,8mm carraige bolts and lock nuts supplied. |
Tighten securely. |
• Slip all the vinyl bindings over the bagger tubes |
• Slide the bagger dump handle through the hole in the |
2
1.Front bagger tube
2.1/4 x 50,8mm Carriage Bolts
3.1/4 Lock nut
4. Vinyl Binding | 1 |
|
5.Dump handle tube
6.Clevis pin
7.Retainer spring
6
7
4
6MM (1/4") - 9MM (3/8")
bagger top, install the clevis pin and secure with retainer |
spring. |
NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.
Bagger adjustment
For proper bag function and appearance, it may be neces- sary to adjust the bagger assembly. There should be 6mm
Horizontal adjustment
1
2
3
1.Top Surfaces Even
2.Horizontal Adjustment Bracket
3.Vertical Adjustment Bracket
•Slightly loosen the nuts securing the bagger RH and LH horizontal adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.
•Move the brackets the amount forward or backward you wish the bag assembly to move. Retighten the nuts se- curely.
Vertical adjustment
•Slightly loosen the nuts securing the vertical adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.
•Move the brackets the amount up or down you wish the bag assembly to move. Retighten the nuts securely.
•Reinstall the bagger assembly and check the bagger to fender fi t. If necessary, repeat the procedure until proper fi t is attained.
To convert to bagging, mulching or discharge See "Section 5" of this manual.
24