Maintenance and Care | Version 06/05 | WTC 600 LP / MP |
|
|
|
3 Maintenance and Care
The equipment may be put into operation only when
3.1 Starting Operation | • The reset button (23) starts the pump after fail- |
Before starting operation: | ure |
|
•Make sure that the equipment is connected to the untreated water source and the respective transporting gear, e. g.,
•Ensure the unrestricted flow of the drinking water into a tank or a suitable device on the user side.
3.1.2Filling the Metering Stations
If the system is equipped with one or i more metering stations, it must be en-
sured that these are correctly filled and connected.
| The drinking water must be able to run | • Put on protective clothing. |
| |
| • Open the lid (27) of the metering station (30). | |||
| off without counterpressure. The height | |||
| difference must not exceed 3 m. |
|
| |
3.1.1 |
|
| ||
i | In case an | 28 | 29 | |
|
| |||
is necessary, it will be installed by a |
|
| ||
Kärcher service technician. | 27 |
| ||
The |
|
| ||
pump (21) and a control device (22). The operat- |
|
| ||
ing condition of the pump is indicated with three |
|
| ||
indicator lights: |
|
| 30 | |
• Green (24): Ready for operation |
| |||
|
| |||
• Yellow (25): Pump delivering |
|
| ||
• Red (26): | Malfunction or water low |
|
| |
|
| 23 | • Fill the respective chemical into the metering | |
|
| station according to Section 3.2.6. |
| |
|
|
|
| |
22 |
| 24 | The metering stations must not be | |
| 25 | mixed up or mistaken, meaning filled | ||
|
| |||
|
| with the wrong chemical. |
| |
|
| 26 |
| |
|
| • Add the corresponding amount of | ||
|
|
| ||
|
|
| drinking water. |
|
|
|
| • Shut the lid of the metering station. |
|
|
|
| • Pull the mixing rod (28) out of the metering | |
21 |
|
| station to the stop and push back in again. | |
|
|
| Repeat this procedure for approx. 5 minutes | |
|
|
| until the chemical is completely mixed. | |
4 |
|
|
|
|