Check List
CHECK LIST OF STEP-BY-STEP GUIDES TO INSTALL
Review the following list to ensure you have completed all the installation procedures.
____1. Check the incoming water. Has incoming water
been tested?
____2. Remove cardboard packaging from salt tank.
____3. Is the incoming water going to the valve inlet?
____4. Is the bypass valve placed into the service
position?
____5. Is the ground clamp installed?
____6. Are the drain lines clamped and secured?
____7. Is the unit plugged into a continuously live outlet?
____8. Has salt been added to the salt tank?
Water Supply
Valve Inlet
Bypass Valve(s)
Plastic
Note: Stem may be installed in either direction. The end with writ- ing should be pulled out for service position.
____9. Has the unit been sanitized? See page 19.
FOR SERVICE
Close bypass valve. Open inlet & outlet valves.
Outlet Valve
Bypass
Valve
Inlet
Valve
FIG. 30
21