Assembly

NOTE: Hand tighten bolts and nylon nuts until machine is fully assembled.

 

44

 

 

 

21

 

 

41

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

26

 

 

22

 

 

 

 

 

 

 

 

 

 

13

32

 

 

27

13

32

22

38

 

45

5

 

32

 

43

47

 

 

 

 

 

 

 

27

 

 

45

 

 

 

 

 

 

 

 

 

 

 

46

 

 

 

32

 

22

35

23

24

 

22

 

30

 

 

 

 

4

32

13

 

 

 

 

 

 

 

31

25

 

 

 

 

 

 

27

34

23

STEP 5:

22 33

Attach the leg developer (#5) between the brackets on the front of the front base ( #4) with one bolt M10X75 (#38), two washers 10 (#43) and a nylon M10 (#45) nut.

Push a roller tube (#13) through the upper and lower holes in the leg developer and through the tube welded to the back of the front base. Push a foam roll onto each side of each tube.

Push the threaded end of the leg developer safety hook (#35) through the small welded tube across the front of the front base secure with one small nylon nut M8 (#46).

Attach the arm curl pad to the arm curl post (#6) with two bolts M8x20 (#41) and two wash- ers 8 (#44). Push the arm curl post down into the top of the front base, adjust and secure with one small knot bolt M12x60mm (#30) installed from behind the front base.

Congratulations!!! You have completed assembly of your ST-OBA2.

9

Page 9
Image 9
Keys Fitness ST-OBA2 owner manual Assembly