HOW IT
WORKS
l | Compressor | runs |
|
| |
l | Condenser | fan runs |
| ||
0 | Water | pump | runs | (clrculafes | waler) |
0 | Cutler | gnd | IS warm | to touch |
|
WHEN THE DESIRED ICE SLAB THICKNESS IS REACHED, THE HARVEST CYCLE BEGINS AND THE FOLLOWlNG HAPPENS:
Evaporalor thermostal IS Sallshed
Compressor keeps running
Condenser fan slops or turns very slowly
Waler pump slops
HOI gas solenoid opens
Water Intel valve opens
Excess waler IS flushed oul of the drain pan Cutter grid IS warm lo the touch
NOTE: Normal herveal cycle takes 60 to 120 seconds.
MACHINE RESUMES FREEZING AFTER SLAB IS RELEASED FROM EVAPORATOR AND THE CUlllNG
PROCESS BEGINS.
WHEN THE STORAGE BIN IS FILLED, BIN THERMOSTAT OPENS.
0 Culler grid remam on
BEFORE | OPERATING |
|
|
|
| ||||||||||
THE |
| ICE | MAKER |
|
|
|
|
|
|
| |||||
It | IS your | responslblllly |
| to | make | sure | thal | the | ice | maker: | |||||
l | has been | mslalled |
| where | it | is | protected | from | the | ||||||
| elements. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l | IS localed | so | lhal |
| the front | IS not | blocked, | lo | provide | ||||||
| proper | aw flow. |
|
|
|
|
|
|
|
|
|
|
| ||
l | IS properly | leveled |
|
|
|
|
|
|
|
|
|
|
| ||
l | is located | in | a well | ventilated |
| area | wth | temperalure | |||||||
| above | 15°C | (50°F). | Best | resulls | are | oblalned |
| at | lem- | |||||
| peratures |
| between |
| 21°C | (70°F) | and 32% |
|
|
. | 1s properly | connected | to | a waler | supply | and | drain |
l | IS properly | connected | lo | electruty | A 2201240 | Volt. 50 | |
| Hz. 1 phase, | 10 amp | fused | electrIcal | supply | IS required |
NOTE: Time delay fuse or clrcult breaker IS recommended
l IS properly electrically grounded
l IS nol operated by anyone not able to use it properly
l 1s used only for Ihe job it was deslgned to perform.
. IS properly malntalned
ICE MAKER OPERATION
How it makes Ice:
1.Water IS circulated overa freezlng plate. As the waler freezes, minerals m the waler are rejected. The absence of mmerals oroduces a clear sheet of ice.
2.When the desired thickness IS reached, the Ice sheet is released and slides on lo a culler grid. The grid
diwdes the sheet Into mdwdual cubes
3.The water conlalnmg the rejected minerals IS dramed oul at the end of each freezlng cycle.
4.Fresh waler then enters the machme for the next Ice makmg cy
5.Cubes fall Into the storage bin When lhe bin IS full
Ihe ice maker shuls off automabcally and reslarls when more vce IS needed
5