Ductwork Installation

8.Use 8” round steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Refer to Figure 5.

Wiring to Power Supply

S A F E T Y W A R N I N G

RISK OF ELECTRICAL SHOCK. THIS RANGE HOOD MUST BE PROPERLY GROUNDED. MAKE SURE THIS

IS DONE BY QUALIFIED ELECTRICIAN IN ACCORDANCE WITH ALL APPLICABLE NATIONAL AND LOCAL ELECTRICAL CODES.

BEFORE CONNECTING WIRES, SWITCH POWER OFF AT SERVICE PANEL TO PREVENT POWER FROM BEING SWITCHED ON ACCIDENTALLY.

9.Connect electrical wires.

-Connect three wires (black, white and green) to house wires and cap with wire connectors. Connect wires according to their colors (i.e. black to black, white to white, and green to green). See Figure 6.

-Store wires in the wiring box.

Final Assembly

CAUTION: Install heating lamps last.

10.Drop oil tunnel into recess support near rear of hood. Refer to Figure 7.

11.Install baffle filters and stainless spacer(s). Refer to Measurements and Diagrams on page 21 for baffle filter and stainless spacer placement. Angle baffle filter toward back of hood ￿. Push baffle filter up until almost level ￿. Slide forward into recess behind the front of hood ￿. Lower baffle filter ￿. Slide back until it fits into resting position ￿. Refer to Figure 8.

12.Repeat for all baffle filters and spacers.

13.Install heating lamps (not included), 120 Volts 175 Watts max. each.

7

Figure 5

Figure 6

Figure 7

Page 10
Image 10
Kobe Range Hoods CH0048SQB (48), CH0036SQB (36), CH0030SQB (30), CH0042SQB (42) manual F E T Y W a R N I N G