Duct Cover Installation

5.Use 8” round steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Refer Figure 15. Slide the duct cover onto the hood.

6.Use 3/16” x 3/8” screws (included) to attach duct cover to hood.

Final Assembly

CAUTION: Install heating lamps last.

7.Drop oil tunnel into recess support near rear of hood. Refer to Figure 16.

8.Install baffle filters and stainless spacer(s). Refer to Measurements and Diagrams on page 21 for baffle filter and stainless spacer placement. Angle baffle filter toward back of hood ￿. Push baffle filter up until almost level ￿. Slide forward into recess behind the front of hood ￿. Lower baffle filter ￿. Slide back until it fits into resting position ￿.Angle baffle filter toward back of hood ￿. Refer to Figure 17.

9.Repeat for all baffle filters and spacers.

10.Install heating lamps (not included), 120 Volts 175 Watts max. each.

11.Turn power ON in control panel. Check all lights and fan operation.

12.Make sure to leave this manual for the homeowner.

11

Figure 15

Figure 16

Figure 17

Page 14
Image 14
Kobe Range Hoods CH0048SQB (48), CH0036SQB (36), CH0030SQB (30), CH0042SQB (42) manual Duct Cover Installation