WALL MOUNT INSTALLATION – REAR VENT
***This installation only applied with the purchase of a duct cover (Model No. CH1120DC).
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.
-Decide the location of the venting pipe from the hood to the outside. Refer to Figure 21.
-A straight, short venting run will allow the hood to perform more efficiently.
-Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.
-Use duct tape to seal the joints between pipe sections.
-If necessary, prepare back wall frame with cross framing lumber for secure installation.
Using references on Table 2 and measurements on page
-
Hood Preparation before Installation
-Temporarily wire the hood to test for proper operation before installing.
-Peel protective film off the hood and the duct cover (if any).
-Remove the screws on the vent cover (rear) and cut along the line of the inner vent cover (rear) opening. Refer to Figure 23.
-Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 24.
Figure 21
Inner Vent
Cover (Rear)
Figure 22
Reversed
Vent Cover
(Rear)
Figure 23 | Figure 24 |
13