Kohler 114522-2-CE manual Installation Checkout, Install Wall

Models: 114522-2-CE

1 12
Download 12 pages 17.93 Kb
Page 6
Image 6
4. INSTALLATION CHECKOUT
Turn the valve on and verify that water does not run.
If the valve has stops, rotate both stop adjustments fully clockwise.

Back￿to￿Back Installation:

Never install a valve body upside down. If two valves are installed in a back0to0back configuration, install both as previously instructed. The supplies to one of the valves will be reversed.

To correct the valve control on the reversed valve, remove the plaster guard, cap assembly and collar. Rotate the cap assembly and collar 180° (tab on bottom), reassemble and tighten the screws.

Reinstall the plaster guard.

Plaster

Hot Guard

Supply

Valve

Body Collar

Tab

Cold

Supply180_

Cap Screws

Assembly

4. INSTALLATION CHECKOUT

Install caps to the temporary bath Turn the valve off. and shower nipples.

Turn on the hot and cold water supplies and check the new installation for leaks.

Remove the caps from the temporary nipples.

Remove

the

plaster guard.

Turn the valve off and rotate

Turn the valve stem to the •On" both stop adjustments fully

position

and

cycle the

control

counterclockwise.

through

its

operating

range.

Reinstall the plaster guard.

 

 

 

 

5. INSTALL WALL

Thick Wall Installation (Tile, Plaster, Marble, etc:.)Provide

a 509/16" (141.1cm) diameter hole in the rough wall material. The flat front surface of the plaster guard must be flush with the finished wall.

Complete the finished wall.

Do not remove the plaster guard until instructed.

Finished Wall

UP

 

559/16"

 

 

 

HOT

(141.1cm) D.

 

 

 

 

Plaster

 

 

Guard

253/4" (7cm)-4" (10.2cm) Rough5In Depth

114552525CE

6

Kohler Co., Kohler, WI

Page 6
Image 6
Kohler 114522-2-CE manual Installation Checkout, Install Wall