Kohler K-2210, K-2211 manual Preparation, Préparation, Verify cabinet clearance, Trace the cut-out

Models: K-2210 K-2209 K-2205 K-2214 K-2211

1 16
Download 16 pages 59.98 Kb
Page 4
Image 4
Verify cabinet clearance.

1

2

Verify cabinet clearance.

Vérifier le dégagement du meuble.

Verifique el espacio libre del gabinete.

3

Trace the cut-out.

Tracer la découpe.

Trace la abertura.

Cut along the inside line.

Découper le long de la ligne intérieure.

Corte sobre el interior de la línea.

Preparation

If possible, install the faucet and drain to the lavatory before installing the lavatory.

Install the water supplies and drain piping according to the roughing-in information.

Verify cabinet clearance beneath the countertop to accommodate lavatory basin, faucet valving, and drain piping.

Cut out the template where indicated for the countertop opening. Cut along the inside of the cutting line.

Position the template on the countertop to ensure clearance between the lavatory, faucet, and backsplash.

Trace around the template on the countertop with a pencil. Mark the faucet hole centerline on the countertop.

Préparation

Si possible, installer le robinet et le drain au lavabo avant d’installer ce dernier.

Installer les alimentations d’eau et tuyauterie du drain selon l’information du plan de raccordement.

Vérifier le dégagement du meuble sous le comptoir afin d’accomoder le bassin du lavabo, les valves du robinet, et la tuyauterie du drain.

Découper le gabarit à l’emplacement de l’ouverture du comptoir. Découper le long de la ligne intérieure du découpage.

1068257-2-B

4

Kohler Co.

Page 4
Image 4
Kohler K-2210 Preparation, Préparation, Verify cabinet clearance, Vérifier le dégagement du meuble, Trace the cut-out