5. SITE PREPARATION
A OLD BATH REMOVAL
Disconnect the drain at the trap. Remove the old wall material. S bad d d ba
c ,and slide the old bath out of the recess as illustrated.
h | |
| |
| en |
|
B SUBFLOOR PREPARATION
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is flat and level.
C | STUD | POCKET PREPARATION |
|
|
| ||||
Construct a recess designed for your particular |
|
|
|
| |||||
installation. Framing is of | 2x4 construction. Make sure | 69º (175.3cm) |
| ||||||
you allow for access to the pump in the event the unit |
|
| |||||||
requires service. When constructing the | framing, | allow |
|
| |||||
for | the thickness of sub | and finished | wall materials. |
|
| ||||
If an apron wall without | a ledge is desired, the finished |
|
| ||||||
apron wall surface must be 1/16" (2mm) under | the | bath |
|
| |||||
rim. |
|
|
|
|
|
|
| 40º | |
The | whirlpool | can be installed in a corner. Recess | or | 19º R. | (101.6cm) | ||||
sunken installations are also possible. Steps 1. | through 3. | ||||||||
| |||||||||
below illustrate suggested stud construction. |
|
|
|
| |||||
Modifications may be needed for other types of |
| Vintage Cutout |
| ||||||
construction. |
|
|
|
|
|
|
|
NOTIC: D a d d
aa.
1.C Iaa: The suggested stud construction is illustrated.
Kohler Co., Kohler WI U.S.A. | 4 | AB |
|
|