3. PRODUCT REQUIREMENTS
A. SUMMARY OF KEY REQUIREMENTSB PRODUCT INSPECTION
S Observe all local plumbing and building codes. | Carefully | unpack | the | whirlpool, | remove | the | protective | |||
S | Install the unit level with the subfloor. | tape, and | inspect | the | unit for | damage. | Leave | all | ||
materials | in the | carton during | construction | to | preven | |||||
|
| |||||||||
S | Provide | damage. |
|
|
|
|
|
|
|
SMake sure the drain location corresponds to the bath outlet.
S The | whirlpool can be | installed | in a corner. Recess |
or | sunken installation | is also | possible. |
4.INSTALLATION REQUIREMENTS
A. MATERIALS | REQUIRED |
|
|
| B. TOOLS | REQUIRED |
|
| ||||||
S | Plumbers putty |
|
|
|
|
| S | Arc pliers or 14º pipe wrench |
|
| ||||
S | Silicone sealant |
|
|
|
|
| S | Rule |
|
|
|
| ||
S | Metal shims |
|
|
|
|
|
| S | Level |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
S | Drop cloth |
|
|
|
|
|
| S | Square |
|
|
|
| |
S Wall coverings, as necessary |
|
|
| S | Screwdriver |
|
|
| ||||||
S | Cement board |
|
|
|
|
| S | 7/16º ratchet or combination wrench |
|
| ||||
|
|
|
|
|
|
|
|
| S | Conventional woodworking tools |
|
| ||
|
|
|
|
|
|
|
|
| S | Safety shoes |
|
|
| |
T Site preparation and wall/floor finishing | may S | Safety glasses |
|
|
| |||||||||
require | additional | materials. |
|
|
| S | Pliers |
|
|
|
| |||
|
|
|
|
|
|
|
|
| S | Utility knife |
|
|
| |
|
|
|
|
|
|
|
|
| T Site | preparation and wall/floor | finishing | |||
|
|
|
|
|
|
|
|
| may | require | additional tools. |
|
| |
|
|
|
|
|
|
|
|
| ||||||
C. CLEARANCE REQUIREMENTS |
|
| D. | NEW | OR | REPLACEMENT |
|
| ||||||
|
|
|
|
|
|
|
|
| INSTALLATION | REQUIREMENTS | ||||
Check the roughing#in and room dimensions to provide |
|
|
|
|
| |||||||||
adequate | available | space for | the bath | unit. |
|
| This unit can be installed in new or existing | |||||||
|
|
|
|
|
|
|
|
| ||||||
TI M | bathrooms . |
|
|
|
| |||||||||
This | is | the combined | weight of the | bath, | water, | and | two |
|
|
|
| |||
|
|
|
|
|
|
|
|
| Position the plumbing | |||||
bathers. | Carefully | plan | the | moving | of the | bath | into the |
|
|
|
| |||
construction area. | This | bath | is heavy | and will not | according to roughing#in dimensions beginning on | |||||||||
easily | fit |
|
|
|
| |||||||||
through | doorways. | Carefully | follow all | instructions |
| Page |
|
|
|
|
| |||
| in this |
|
|
|
| |||||||||
manual. |
|
|
|
|
|
|
| Remove the old | ||||||
|
|
|
|
|
|
| bath. | Remove | the old wall material, and | remove any | ||||
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
| old floor covering from the area. Remove any old | |||||
|
|
|
|
|
|
|
|
| plumbing that does not conform to roughing#in | |||||
|
|
|
|
|
|
|
|
| requirements. |
|
|
|
|