PAYCLOCK & FACEIN USER’S GUIDE
8
Install the FaceIN Terminal Step 1: Select a site to install your FaceIN terminal that will be
convenient to employees clocking in and out. When deciding where
the terminal will be installed, keep in mind that an 115vAC power
outlet should be within 6 feet of the mounting location as well as a
connection to the network (LAN).
Note about Direct Sunlight - It is not recommended to have the
terminal mounted in a location where it is exposed to direct sunlight.
This could be troublesome during the registration process.
Step 2: After selecting the appropriate installation site, use the
terminal to determine the appropriate height. Have the shortest
employee stand in from of the terminal. Hold the terminal on the
wall so that this employee can comfortably center their face in the
LCD display window. Mark the height of the terminal on the wall.
Note: Taller employees can easily adjust their stance to center their
face in the LCD display window.
Install the mounting-plate to the wall using the supplied screws. For
sheetrock walls, drill a 3/16” diameter hole through each of the four
screw locations; each approx 1-1/2” deep. Install the plastic
“anchors” included in the mounting screw packet.