2. Installation

2-1. Starting Up

This section will give users a quick start for:

-Hardware and Cable Installation

-Management Station Installation

-Software booting and configuration

2-1-1. Hardware and Cable Installation

At the beginning, please do first:

Wear a grounding device to avoid the damage from electrostatic discharge

Be sure that power switch is OFF before you insert the power cord to power source

Installing Optional SFP Fiber Transceivers to the GSW-2496 L2 Managed Switch

Note: If you have no modules, please skip this section.

Fig. 2-1 Installation of Optional SFP Fiber Transceiver

Connecting the SFP Module to the Chassis:

The optional SFP modules are hot swappable, so you can plug or unplug it before or after powering on.

1.Verify that the SFP module is the right model and conforms to the chassis

2.Slide the module along the slot. Also be sure that the module is properly seated against the slot socket/connector

3.Install the media cable for network connection

4.Repeat the above steps, as needed, for each module to be installed into slot(s)

5.Have the power ON after the above procedures are done

8

Page 16
Image 16
LevelOne GSW-2496 user manual Starting Up, Hardware and Cable Installation, Connecting the SFP Module to the Chassis