| 4 |
| 2 9 |
| 4 2 |
| 1 |
| 1 0 |
| 2 7 |
1/2 X 4” | 37 |
FIGURE 12 |
|
STEP 12
•Slide two 13/16” SHAFT COLLARS (42) down over the GUIDE RODS (10) as shown in FIGURE 12.
•Slide the TOWER BRACE (4) over the GUIDE RODS (10) as shown in FIGURE 12.
•SECURELY assemble the TOWER BRACE (4) to the TOWER (1) using two 1/2 X 4” BOLTS (37), two 1/2” WASHERS (27), and two 1/2” LOCK NUTS (29) as shown in FIGURE 12.
1/2
1/2
1/2
1/2
1/2
1/2
0
1 | 2 | 3 | 4 | 5 |
|
|
|
|
|
13
6