FIGURE 11 | |
Make sure CABLE | |
is routed over bolt! | 3/8 X 2” |
|
STEP 11:
•Route the 129-1/2” CABLE (7) through the TOP BOOM and the STACK BOOM (2) as shown in FIGURE 11.
•TIGHTEN any LOOSENED PULLEY connection after CABLE has been routed.
FIGURE 12 | |
6 | 16 |
7 | |
14 | |
3/8 X 2-3/4” 13 | 2 |
STEP 12: | |
•SECURELYassemble two 3-1/2” PULLEYS (6) to the STACK BOOM (2) using two 3/8 X 2-3/4” BOLTS (13), four 3/8” FLANGE SPACERS (14), and two 3/8” LOCK NUTS (16) as shown in FIGURE 12. (NOTE: Make sure the cable is routed over all the pulleys.)
•TIGHTEN any LOOSENED PULLEY connection after CABLE has been routed.
9