5

STEP 5:

FIGURE 5

STEP 4:

FIGURE 4
Insert two 3 X 2” END CAPS (8) into the ends of the STACK BOOM (2) as shown in FIGURE 4.
SECURELY assemble the 1-3/4 X 9-3/8” TUBE (3) to the STACK BOOM (2) using one 1/2 X 2-3/4” BOL T (17), two 1/2” W ASHERS (19),
and one 1/2” LOCK NUT (20) as shown in FIGURE 4.
Insert two GUIDE ROD BUSHINGS (22) into the tubes on the STACK BOOM (2) as shown in FIGURE 4.
3
2
8
1/2 X 2-3/4” 17
20
22
1
8
Insert two 3 X 2” END CAPS (8) into the ends of the STACK BASE (1) as shown in FIGURE 5.
11
19
Insert one 1-3/4” END CAP (11) into the 1-3/4 X 9-3/8” TUBE (3) as shown in FIGURE 4.