3.2PACKAGING

Parts: None

Remove all packaging and place main components to the side of the box. Break box down in each of the four corners.

Note: Support pedal levers when removing internal packaging to prevent damage to the pedals.

3.3ASSEMBLE THE STABILIZERS

Parts: Hardware Bag #1 (4, M10 X 15mm Silver Hex Head Bolts)

Tools: 17mm Socket Wrench

Assemble the stabilizer tubes (feet) (A) to the bottom base brackets (B) of the product using two M10 X 15mm Hex Head Bolts (1) on each stabilizer tube. Both stabilizer tubes (feet) are identical.

B

1

 

 

A

3.4ASSEMBLE THE CONSOLE UPRIGHT

Parts: Hardware Bag #2 (3, M10 X 74mm Silver Hex Head Bolts)

(1, M10 X 20mm Silver Hex Head Bolt)

Tools: 17mm Socket Wrench

The console upright tube (C) is pre-assembled with one bolt so that you can simply lift the upright into place by pivoting upward. Hold the upright in place and install three M10 X 74mm Silver Hex Head Bolts (2) into the side of the main bracket (D). Install one M10 X 20mm Silver Hex Head Bolt (3)

into the front of the bracket.

CAUTION: Do not pinch wires when assembling the upright.

3.5CONNECT BASE WIRING

Parts: None

C

Connect the two wires (E) at the base of the upright.

2

 

D

3

D

 

E

 

 

9

Page 10
Image 10
Life Fitness 8973801 REV B-3 Packaging, Assemble the Stabilizers, Assemble the Console Upright, Connect Base Wiring