28
19 |
18 |
21 |
STEP 9:
Make adjustments to the HEAD PLATE PULLEY (19) and the threaded cable end to adjust cable length and to ensure the cable is taut.
If the threaded cable end is completely threaded into the LEFT ROLLER CARRIAGE (28) and there is still some slack in the CABLE (21), remove the pulley from the HEAD PLATE PULLEY (19). Thread the HEAD PLATE PULLEY (19) further into the TOP PLATE ASSEMBLY (18) and reinstall the pulley.
Once the CABLE (21) is taut, engage the jam nut at the threaded end of the cable as well as at the HEAD PLATE PULLEY ASSEMBLY (19).
18