Contents
OHDPR9
OLYMPIC HEAVY DUTY POWER RACK 9’
ASSEMBLY INSTRUCTIONS
Tools Required for Assembly
PARTS LIST
Bolt Length Ruler
3/4”, 9/16” wrench Ratchet with 3/4”, 9/16” socket 7/32” Allen Wrench
18 3/8 X 3-3/4” FLAT HEAD BOLT
17 1/2 X 1-1/2” BOLT 26 1/2 X 4-1/4” BOLT 16 1/2 X 4-1/2” BOLT
1/2” INT TOOTH LOCK WASHER
3/8” INT TOOTH LOCK WASHER
STEP
STEP
26 1/2 X 4-1/4” Use this set of holes for assembly with PLATFORM
Use this set of holes for assembly without PLATFORM
STEP
LOOSELY assemble the FRONT UPRIGHT 3 to the LEFT UPRIGHT BASE 1 using two 1/2 X 4-1/4” BOLTS 26, two 1/2” PLASITC DOME WASHERS 22, two 1/2” INT TOOTH LOCK WASHERS 20 and two 1/2” LOCK NUTS 23 as shown in FIGURE
1/2 X 4-1/2”
STEP
1/2 X 4-1/2”
STEP
1/2 X 4-1/4”
STEP
TIGHTEN
TIGHTEN
STEP Securely tighten all loose frame connections made to this point
TIGHTEN
STEP
SETTINGADJUSTMENTRACKWIDTHSEEDETAIL8
DETAIL
1/2 X 4-1/4”
STEP
17 1/2 X 1-1/2”
Tighten connection SECURELY then back nut off 1/2 turn
STEP
STEP
Insert the LEFT BAR SUPPORT 12 into the desired slots of the LEFT ADJUSTMENT RACK 10, and allow it to drop down to lock in place. See FIGURE
STEP
equipment, call your local Hammer Strength distributor
CAUTION-PLEASE READ
PREVENTATIVE MAINTENANCE TIPS
follow these rules
3. Exercise with care to avoid injury