SM42 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM42.

 

4

 

1

5

6

 

 

8

2

7

3

Figure 2. SM42 main components.

1.

1 stack cell

5.

Lat top

2.

4 stack cell

6.

Tricep top

3.

Lat bench

7.

300 lb. Weight stacks (1)

4.

Connecting beam

8.

190 lb. Weight stacks (3)

1.Place the two weight “cells” in their final resting spots. The cells will be approximately 11’4” apart as shown in Figure 3.

4

Page 4
Image 4
Life Fitness manual Assembly, SM42 main components