SM42 Unpacking & Assembly Instructions
7
4. Mount the 56” lat top (part T from HARDWARE section) to the 4-stack cell using a
5/8” socket and combination wrench. Insert two of the large 7/16” by 6” bolts using the
hardware configuration shown in Figure 7. Mount the 29” tricep top (part U in
HARDWARE section) to the frame and connecting beam (See Figure 7).
Figure 7. Configuration for 6” bolts.
150 lb.
weight stack
300 lb.
weight stack
150 lb.
weight stack
Figure 8. Mount the weight stacks.
5. Mount the weight stacks to the 4-stack cell. To do this:
A. Remove the tricep back rest bolts using a 9/16” socket and combination
wrench (see Figure 9).
B. Unbolt the top plate and remove the guide rods using a 9/16” socket and
combination wrench (see Figure 9).