SM51 Unpacking & Assembly Instructions
6
Figure 5. Configuration for 2-3/4” and 3” bolts.
3. Bolt on the connecting beam (part 4 from Figure 2) using a 5/8” socket with
extension and combination wrench, to the cells using two of the large 7/16” x 6” bolts,
7/16” washers, and 7/16” nuts (parts A, B, and C in HARDWARE section at end of
these instructions), end cap washers and end caps (parts F and H in HARDWARE
section). Figure 6 shows the connected cells. You will need to remove the pulleys
from the teardrop pulley assemblies to gain clearance for the socket wrench
extension. Leave the pulleys out of the housings until the cables have been installed.
7/16” x 6” (6)-
mount on tops
3/8” x 3”
(
2
)
-
bolt top
beams to
g
ether
TU
Remove pulleys from
housings to give clearance
to socket extension
Figure 6. Bolt on the connecting beam, lat top, and tricep top.