SM62 Unpacking & Assembly Instructions

LAT PULLDOWN CABLE ROUTING

Route the lat pulldown cable as shown in Figure 21. Screw the cable into the weight stack as shown previously in Figure 20.

Figure 19. Lat pulldown cable routing.

Bolt the cable to the weight stacks as shown in Figure 20. Thread the 7/8” nut up on the cable bolt as shown at left. Screw the bolt down into the weight stack as shown at right. Tighten the bolt with a 7/8” combination wrench.

Figure 20. Screw the cable into the weight stack.

15

Page 15
Image 15
Life Fitness SM62 manual LAT Pulldown Cable Routing, Lat pulldown cable routing