SM62 Unpacking & Assembly Instructions
7
3/8” x 3” (4)
bolt top
beams together 7/16” x 6” (8)
mount on tops
UTTV
Remove pulleys from
housings to give clearance
to socket extensio
n
Figure 7. Bolt on the connecting beam, lat tops, tricep tops.
4. Mount the 56” lat tops (part T) to the cubes using a 5/8” socket and combination wrench
by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in
Figure 7. Mount the 29” tricep tops (part U) to the cubes using the 7/16” x 6” bolts.
Secure to the lat tops using the 3/8” x 3” bolts. Use the hardware configuration shown in
Figure 7. You will need to remove the pulleys from the teardrop pulley assemblies to gain
clearance for the socket wrench extension. Leave the pulleys out of the housings until the
cables have been installed.
150 lb.
weight stack
300 lb.
weight stack
150 lb.
weight stack
Figure 8. Mount rubber bumpers and the weight stacks.