SM62 Unpacking & Assembly Instructions
C. Prepare the weight stack- add bumpers to bottom, insert guide rods, put pull pin in bottom stack.
D. Flip over the weight stack
onto piano dolly.E. Hoist the weight stack onto the machine.
Figure 10. Install the weight stacks.
F.Bolt on the top plate to the top of the cells with the top plate on the guide rods as shown in Figure 11 using a 9/16” socket and combination wrench and the 3” bolts (with cap washers) that were previously inserted.
Figure 11. Bolt on the top plate.
6.Bolt the floating pulleys into the 190 lb weight stacks used for the crossovers using a 7/8” combination wrench. You will need to remove the pulley from the housing to thread the plug into the weight stack bayonet. Make sure the 9/16” jam nut is threaded 1-5/8” away from the pulley as shown in Figure 12. Leave the pulleys out since you will need to have them out when the cable is routed.
9