ASSEMBLY INSTRUCTIONS
Also, See Illustrations E & F on pages 12 & 13, showing the hose connections to CO2 regulator and the regulator to the beer tap.
Installing the Guardrail
Follow the steps below to install the guardrail.
1.Place the guardrail on top of the cabinet.
2.Align all support feet of the guardrail with the holes on the top of the unit.
Installing the CO2 Regulator and the CO2 Cylinder
Follow these steps to safely install the CO2 regulator and CO2 cylinder. You must read and understand the following procedures for the CO2 cylinders before installation.
NOTE: Your CO2 cylinder has DOT (USA Department of Transportation) approval; however the cylinder has been shipped empty to avoid any possible accidents during transportation. When you purchase the first keg of beer, you must also have your CO2 cylinder filled at your local supplier. (See page 4, item 9 for suggested locations within your community.)
Connect to | |
Valve | CO2 Cylinder |
CO2 |
|
Regulator |
|
Co2
Gas Line
Rubber
Washer
Co2
Rubber
Strap
CO2
Cylinder
1.Install the CO2 gas line tube to the regulator by attaching one end of the tube to the hose barb connection on the CO2 regulator. (See Illustration B, on page 6)
2.Insert the special washer (provided with the kit) into the regulator to cylinder attachment nut. (See Illustration A, on page 6)
3.Attach the CO2 regulator to the CO2 cylinder by screwing the regulator nut onto the cylinder valve and tightening with an adjustable wrench.
4.Wrap the rubber strap that is attached to the interior of kegerator unit around the CO2 bottle to secure the bottle in place (as shown above).
5.Position the cylinder so that you would be able to read the numbers on the gauges and have easy access to
7