NewAir AK-200 Install Guardrail, Installing Coupler, Regulating Keg, Quick Assembly Instructions

Models: AK-200

1 17
Download 17 pages 29.8 Kb
Page 15
Image 15
Install Guardrail

QUICK ASSEMBLY INSTRUCTIONS

refrigerator.

3. Sit tower down onto opening and turn counter clockwise to lock.

Install Guardrail

1.Place guardrail (10) over rubber inserts on refrigerator cabinet and push down to secure.

Connecting regulator and coupler (Illustrations on page 9)

1.Make sure regulator valve and CO2 tank valve are off by turning clockwise.

2.Connect regulator (7) to CO2 tank (9). Use open wrench included to tighten.

3.Connect air hose (20) end with green nut to regulator (7).

4.Insert black CO2 rubber washer (4) in opening at back end of coupler (1) before connecting air hose (20). Connect other end of air hose (20) to opening at back end of coupler (1).

5.Insert back flow stopper (2), round end first, into top opening of coupler (1). Insert rubber washer (3) into wing nut at end of beer line. Screw wing nut onto top opening of coupler.

Installing Coupler

1.Make sure black handle on coupler (1) is in the UP position.

2.Insert coupler (1) into keg and turn clockwise to lock.

3.Pull and hold black handle on coupler (1) up and bring lever down to lock into place.

Regulating Keg

1.Turn CO2 tank valve counter clockwise to open.

2.Turn blue regulator valve ¼ - ½ turn clockwise.

3.Within one minute, beer should begin to flow through the beer line.

*If beer is flowing too slowly, turn blue regulator valve counterclockwise until you receive the desired flow.

**If too much foam dispenses, turn off all valves, pull pin on the side of the coupler

(1) to release the pressure. Wait 30 minutes and repeat steps 1-3 under 'regulating keg.

14

Page 15
Image 15
NewAir AK-200 owner manual Install Guardrail, Installing Coupler, Regulating Keg, Quick Assembly Instructions