ASSEMBLY INSTRUCTIONS
you are still unsure whether the kegerator has been properly installed, we recommend that you contact a qualified installer.
Note: Allow the kegerator to stand in an upright position for at least 8 hours before plugging in the unit. This is very important! Once the unit is laid on its side, the refrigerant in the refrigeration system is shifted. The refrigerant in the refrigeration system needs to stabilize before the unit is turned on.
Installing the Casters
Follow the steps below to install the casters.
1.Empty the inside of the cabinet completely and lay the kegerator down on its side. We recommend that you place a piece of cardboard or cloth underneath
the cabinet to prevent dents or scratches.
2.Insert the casters into the holes on the bottom corners of the cabinet. Tighten each caster by turning the head of the bolts clockwise with a wrench. (Not provided in the kit.)
3.Once all four casters have been tightened, stand the cabinet in its upright position.
Note: Two of the casters include locking mechanisms to ensure the unit does not slide on hard floors. These two locking casters should be fastened at the front end of the unit, with the unlocked casters fastened on the rear end.
| Beer |
Installing the Beer Tap | Dispenser |
Tower |
Follow the steps below to install the beer tap.
There are notches on the bottom of the draft arm
assembly that line up with grooves inside the
opening on the top of the kegerator. Align the draft
arm with the opening on the top of the unit, then
Beer Duct
Guard Rail
place inside and twist until secure. No screws are necessary, simply lock it into place.Use the thin
black gasket for assembly. (See Illustrations C & ) D on pages11 &12)
6