Lightolier PPH, MBS, CFH installation instructions Install fixture into Ceiling System by others

Models: PPH CFH MBS

1 2
Download 2 pages 57.23 Kb
Page 2
Image 2
3 Install fixture into Ceiling System (by others).

3 Install fixture into Ceiling System (by others).

Paraplus

For Coffaire (CFH) and Mini-Beam (MBS),

 

open Lamp Shield by gripping Narrow Flange

 

of Lamp Shield and pull Lamp Shield towards

 

you, letting opposite side of Lamp Shield rest

 

on Hinge Pins (Wide Flange).

 

Coffaire

 

Mini-Beam

 

Ceiling System

PARAPLUS (PPH) (by others)

Hinge Pin

(Wide Flange)

Ceiling System

COFFAIRE (CFH) (by others)

MINI-BEAM (MBS)

Hinge Pin (Narrow Flange)

Lamp Shield

4 Secure fixture to Ceiling System using Earthquake Clips (4 places) with Screw (by others).

5 Ballast compartment is accessed by removing ceiling tile adjacent to Mini-Beam. Remove Screws at

Screw

(By Others)

Screw

(By Others)

each end of Ballast Cover. Lift Ballast Cover for easy access to Ballast. To replace Ballast Cover,

Earthquake Housing Clip

Exposed

Slot T-Grid

Ceiling

(By Others)

Earthquake Clip

Exposed

T-Grid

Ceiling

(By Others)

Housing

reverse procedure.

Ballast

Ballast Cover

Acoustical

Material

(By Others)

Housing

End

Screw (By Others)

 

 

Ceiling Tee

Earthquake

Clip

 

(By Others)

 

 

 

Screw

(By Others)

Ceiling Tee

(By Others)

Acoustical

Material

(By Others)

Housing

End

Earthquake

Clip

Screw

Ballast Cover

Ballast

Page 2
Image 2
Lightolier PPH, MBS, CFH installation instructions Install fixture into Ceiling System by others