NOTE: It is now necessary to turn on the power in order to change the Operating Mode (if
applicable), program any changes desired to the operator’s other settings, check for proper
performance of all the operator’s features to include the brake (if applicable) and clutch
(adjusting settings if necessary); and to finalize any adjustments to the limit settings. Before
doing so, ensure that all mounting hardware are installed and properly tightened, that all electrical
connections are per local code requirements, and that proper wiring practices have been followed.
Also, double-check that all ropes have been removed from the door and that the doorway is
clear.
Figure 11
PCB 112695 REV B TSLK
OPENC25
PB1 PB2 PB3
U5
STOPCLOSEOPENC1
R84 R2
R3
D12
COMCLOSESTOPNO REVNC REVPHOTOMOTOR
CONTROL
BOARD
Single 3 Button Station
MOTOR
CONTROL
BOARD
CDOMCB 2005c.p. ALLSTAR CORP.
R8
R24
TB1
P5R93 U5
R4
C21
D1
EXTERNAL INTERLOCK
PHOTO
COM
SINGLE
ILOCK
24 VAC
COM
Single Button and External Interlock Wiring
Figure 13
Note: When adding an External Interlock
remove the factory installed jumper from
the connection terminals.
TURNING ON THE POWER TO THE OPERATORRADIO24V
R56
R55
R54
PCB 112695 REV B TSLKOPENRM1
RM2
RM3
VCC
COM
P7
C25
R94
R87
R38
PB1 PB2 PB3
R5
R25
STOPCLOSEOPENC24
U1D8
U4C11R30R26R29C3C1 C8R95
R2
R3
D2
R65
C10
D3
C9D12
R57
COMCLOSESTOPNO REVNC REVMOTOR
CONTROL
BOARD
Multiple 3 Button Station Figure 12
14
3/SINGLE BUTTON STATION / INTERLOCK FIELD WIRING