Linksys EG24M manual Rack-Mounting the GigaSwitch, Powering On and Resetting the GigaSwitch

Models: EG24M

1 46
Download 46 pages 31.85 Kb
Page 7
Image 7

Linksys EtherFast® II Series

Rack-Mounting the GigaSwitch

The 10/100 Managed 24-Port GigaSwitch can be used as a free-standing unit, or installed in any standard 19-inch rack.

Use the following instructions to rack-mount the GigaSwitch:

Before you begin, disconnect all cables from the GigaSwitch.

1.Place the GigaSwitch right side up, with the front panel facing you.

2.Position a mounting bracket over the screw holes on one side of the GigaSwitch.

3.Secure the mounting bracket by inserting three screws into the screw holes. Use a screwdriver to tighten the screws, ensuring that they are fastened firmly in place.

4.Repeat steps 2 and 3 to install the other mounting bracket on the opposite side of the GigaSwitch.

5.Insert the GigaSwitch into the 19-inch rack and secure it with suitable screws (not provided). Ensure that the ventilation holes are not obstructed.

The rack-mount installation is complete.

You can now re-connect the cables to the back of the GigaSwitch.

10/100 Managed 24-Port GigaSwitch

Powering On and Resetting the GigaSwitch

To power on the GigaSwitch, simply connect the AC power cord to the back of the GigaSwitch, then plug the power cord into an electrical outlet. The GigaSwitch will boot up within approximately 30 seconds.

If you need to reset the GigaSwitch, depress the RESET button (located on the rear of the switch) for approximately one or two seconds.

Uplinking the GigaSwitch

Port 24 on the EtherFast II 10/100 Managed 24-Port GigaSwitch can act as an uplink port, allowing you to uplink to other switches or hubs using a standard Ethernet connection.

To uplink the switch, connect one end of a Category 5 (or better) network cable into Port 24, then connect the other end of the cable into the desired network device’s uplink port. To enable uplinking capability, depress the MDI/MDIX button on the front of the switch.

Installing the Gigabit Expansion Modules

Use the following instructions to install the Gigabit Expansion Modules:

Before you begin power off the GigaSwitch by disconnecting all cables from the GigaSwitch.

1.Place the GigaSwitch right side up, with the rear panel facing you.

2.Use a screwdriver to remove the desired Expansion Module cover plate (labeled “Slot 1” and “Slot 2”). Set the screws aside for step 4.

3.Insert the Gigabit Expansion Module (must be purchased seperately) into the selected Gigabit Expansion Port, ensuring that it is seated firmly in place.

4.Secure the module in place using the screws and a screwdriver.

The Gigabit Expansion Module installation is complete.

You can now re-connect the cables to the back of the GigaSwitch.

6

7

Page 7
Image 7
Linksys EG24M manual Rack-Mounting the GigaSwitch, Powering On and Resetting the GigaSwitch, Uplinking the GigaSwitch