Hot Water Generator Installation and Operation Manual
2Installation
Transporting and unpacking the unit
Each Lochinvar Hot Water Generator is crated as necessary at the factory. The crating is designed to provide protection for the unit during transportation, and to provide a safe means by which to lift and move the unit with a fork lift or hand truck.
In order to prevent damage during shipment the controls package is disassembled at the factory after leak testing. Reassembly will require
All hardware for the reassembly is included with the system. Drawings of the specific controls package are included with each product illustrating the finished assembly. For water to water systems the bypass piping union may remain attached for shipment. See FIG.’s 5 and 6 below for a detailed explanation of the break points.
Figure 5_Steam to Water Storage Heater
Figure 6_Water to Water Storage Heater
6