4Inspection

Hot Water Generator Installation and Operation Manual

4Inspection

The following table summarizes the recommended time intervals for inspections of the water heater, components, inlet and outlet water, energy source lines (steam or boiler water), and power connections.

RECOMMENDED INSPECTIONS

 

 

 

Time Interval

 

 

 

 

 

 

 

 

To Be Inspected

Per

 

 

 

Semi-

 

Manufacturer

Weekly

Monthly

Quarterly

Annually

Quarterly

 

Specs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Circulating Pump

￿

 

 

 

 

 

 

 

 

 

 

 

 

Control Valves -

￿

 

 

 

 

 

Temperature & Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gauges - Pressure &

 

 

 

￿

 

 

Temperature

 

 

 

 

 

 

 

 

 

 

 

Lines - Inlet, Outlet, &

 

 

 

￿

 

 

Return

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Power Connections

 

 

 

￿

 

 

 

 

 

 

 

 

 

Pressure Relief Valve

￿

 

 

 

 

 

 

 

 

 

 

 

 

Shutoff Valves - Manual

 

￿

 

 

 

 

 

 

 

 

 

 

 

Single Solenoid Safety

 

 

 

 

￿

 

System

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Strainers

 

 

 

￿

 

 

 

 

 

 

 

 

 

Temperatures - Water &

 

 

 

￿

 

 

Operating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermometer

 

 

￿

 

 

 

 

 

 

 

 

 

 

Traps - Main & Auxiliary

 

 

 

 

 

￿

 

 

 

 

 

 

 

Magnesium Anode Rods

 

 

 

 

 

￿

 

 

 

 

 

 

 

RECOMMENDED INSPECTIONS 11 Time Interval

Page 11
Image 11
Lochinvar Hot Water Generator 4Inspection, Recommended Inspections, Time Interval, Manufacturer, Monthly, Quarterly, Specs