K00014 STACKING KIT
Installation Instructions
1.The K00014 stacking kit is used for stacking a G- 0400 or
Note: Bin must be level before proceeding to Step 2.
2.Installation of Ice Machines:
A.See service manual for uncrating and inspection of both ice machines.
B.Remove top cover from lower ice machine.
C.Set ice machine carefully and squarely on bin.
D.Remove backing paper from 1” square of
E.Set top ice machine carefully and squarely on bottom ice machine.
F.Remove front and side panels from both ice machines.
G.Bolt two ice machines together with
H.Remove angle A (Fig. 1) and set aside.
3.Installation of Water Shield:
1.Remove the water pump, float
2.Locate the water shield above the electrical box of the lower ice machine, as shown in Illustration 2. It will be secured using the existing screw in the lower
3.Reinstall the sump trough, float
4.Installation of Ice Chute:
A.Remove ice chute from kit and set bottom mounting brackets over angle B (Fig. 1).
B.Put angle A in slots of top mounting brackets and secure in place.
C.Check for free movement of both water curtains.
D.Proceed to ice machine service manual for electrical and water
E.Reattach front and side panels.
F.Add four sheet metal screws to side panels, two on each side of lower ice machine, where the lower and upper ice machines butt.
Manitowoc Ice, Inc.
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI |
|
Telephone | 8001243 |
Web Site - www.manitowocice.com | Rev. 01/13/00 |