INSTALLATION

Never install telephone wiring during a lightning storm.

Never install telephone jacks in wet locations unless the jack is specifically designed for wet locations.

Never touch non-insulated telephone wires or terminals, unless the telephone line has been disconnected at the network interface.

Use caution when installing or modifying telephone lines.

Temporarily disconnect any equipment connected to the phone such as faxes, other phones, or modems.

IMPORTANT INSTALLATION GUIDELINES

Install telephone near both a telephone (modular) jack and an electrical power outlet.

Avoid sources of noise, such as a window by a busy street, and electrical noise, such motors, microwave ovens, and fluorescent lighting.

Avoid heat sources, such as heating air ducts, heating appliances, radiators, and direct sunlight.

Avoid areas of excessive moisture or extremely low temperature.

Avoid dusty locations.

Avoid other cordless telephones or personal computers.

INSTALLING THE PHONE

1.Choose an area near an electrical outlet and telephone wall jack (RJ11C).

2.Plug the AC power converter into an electrical outlet and the DC connector into the power jack on the back of the base.

CAUTION: Use only the ATLINKS USA, Inc. power converter 5-2620 (black) or 5-2627 (white) that came with this unit. Using other power converters may damage the unit.

3. Install the handset battery.

NOTE: You must connect the handset battery before use.

9

Page 9
Image 9
GE 25825, 25826 manual Installing the Phone, Important Installation Guidelines

25825, 25826 specifications

The GE 25826 and 25825 are notable variants of General Electric’s robust line of track and signaling systems that have been engineered to meet the demanding needs of modern railway operations. Both models exhibit exceptional reliability and efficiency, making them indispensable tools for railroad companies across the globe.

One of the standout features of the GE 25826 and 25825 is their advanced signal processing capabilities. These models incorporate cutting-edge digital technology that enhances the accuracy and speed of train control systems. With real-time monitoring and data analysis, they can efficiently manage train movements, reducing the risk of collisions and improving overall safety on the tracks.

The design of both models emphasizes ease of installation and maintenance. The GE 25826 and 25825 units are built with modular components that allow for straightforward repairs and upgrades. This modularity not only minimizes downtime but also ensures that the systems can be adapted to evolving operational requirements, making them future-proof investments for railway operators.

In terms of interoperability, these systems are designed to function seamlessly with a variety of communication protocols and platforms. This adaptability facilitates smoother integration into existing infrastructure, allowing railway companies to enhance their operations without the need for complete overhauls.

The technological advancements in the GE 25826 and 25825 also encompass energy efficiency. They use power-saving modes during periods of inactivity, contributing to overall cost savings and sustainability goals within the railway sector. This feature aligns with the growing emphasis on reducing the environmental impact of transportation.

Moreover, the rugged construction of both models ensures they can withstand harsh operating environments. Built with high-quality materials intended to endure extreme weather conditions and heavy wear, these systems promise longevity and durability, reducing the frequency of replacements.

In summary, the GE 25826 and 25825 are state-of-the-art signaling and control systems that combine advanced technology with practical design features to enhance railway safety and efficiency. Their robust performance, coupled with energy-saving functionalities and ease of maintenance, positions them as leading choices for railway operators looking to modernize and optimize their systems.