MBB100 User’s Manual
c) Connect the 12VDC connector from the AC power adapter to the MBB100’s 12VDC power
input connector.

2.4.6 Power Sequencing

When the MBB100 is connected to an appropriate power source, you can use the power switch
located on the front panel (see Figure 5) to turn the MBB100 on or off. If the MBB100 is turned on,
then the LED found behind the power button will be illuminated blue. If the power switch is pushed to
power down the DSM800, the LED is turned off.
The MBB100 can also be switched on and off by applying or removing power through an external
switch or breaker. Anytime the power is reapplied to the MBB00, it will turn on.
2.5 Configuring the MBB100
In order to use the MBB100, you must already have N2KServer® installed and running on either a
Windows PC or on a Maretron IPG100 Internet Protocol Gateway.
You must also have some information as to the configuration of your local area network.
The MBB100 will start up with the following warning screen:
Figure 9 – MBB100 Startup Screen
You are required to press Accept and thereby acknowledge this warning message before N2KView®
will run in Live Mode.

Page 8 Revision 1.0