®®

Revision 1.0 Page 3

2 Installation

2.1 Unpacking the Box

When unpacking the box containing the Maretron MBB100, you should find the following items:
1 – MBB100 Maretron Black Box Vessel Monitoring and Control
2 – Mounting Brackets
1 – Short Screw Set (Used for Mounting Bracket)
1 – AC Power Cord
1 – AC Power Supply
1 – Rubber Feet/Long Screw Set
1 – MBB100 User’s Manual
1 – N2KView® Documentation CD-ROM
1 – Warranty Registration Card
If any of these items are missing or damaged, please contact Maretron.

2.2 Choosing a Mounting Location

The MBB100 must be mounted in an indoor location.

2.3 Mounting the MBB100

The MBB100 can be mounted to a wall or other flat surface with the included mounting brackets.
2.6.1 Mounting the System with Mounting Brackets
To mount the MBB100 onto a wall or some other surface using the two mounting brackets, please
follow the steps below.
Step 1: Turn the MBB100 over.
Step 2: Align the two retention screws holes in each bracket with the corresponding retention screw
holes on the sides of the MBB100 bottom surface (marked in yellow in Figure 2).
Step 3: Secure the brackets to the MBB100 by inserting two retention screws into each bracket (see
Figure 2).
Step 4: Drill holes in the intended installation surface.
Step 5: Align the mounting holes in the sides of the mounting brackets with the predrilled holes in the
mounting surface.
Step 6: Insert four retention screws, two in each bracket, to secure the MBB100 to the wall.