FINAL INSTALLATION

Glass Bi-Fold Door Installation:

WARNING

Glass doors must be installed on all Propane/LPG units and operated in the closed position to eliminate any potential for soot spillage into the room. When installing a natural gas unit with glass door option, the unit must be operated with glass doors completely opened or completely closed.

1.Remove and discard the two (2) screws that secure the C-Channel below the top opening of the fireplace.

2.Attach bottom rail (#1) to unit with 2 sheet metal screws (#3). Refer to Figure 20.

3.Attach top rail (#2) to unit with 2 sheet metal screws (#3). Refer to Figure 20.

4.Place bottom metal door pin in bottom spring latch then rotate top of door into top spring latch. Refer to Figure 21. Repeat step 3 for other door.

Figure 20: Door Rail Installation

Figure 21: Glass Door Installation

NOTE

Follow installation instructions located inside package.

22

Page 23
Image 23
Martin Fireplaces BV4536, BV5142 operating instructions Door Rail Installation