IZ4 Notice of Acceptance
Exact instructions for installing windows certified for use in Impact Zone 4 are not included in this publication. The installer/contractor MUST install the window(s) according to detailed drawings found in the Notice of Acceptance (NOA) to the Product Control Division of the
NOA | DESCRIPTION | URL |
Clad Casemaster Polygon/RT Picture | http://www.miamidade.gov/buildingcode/library/productcontrol/noa/07052408.pdf | |
|
|
|
Clad Casemaster Operating RT/Polygon | http://www.miamidade.gov/buildingcode/library/productcontrol/noa/07052406.pdf | |
|
|
|
Clad Awning | http://www.miamidade.gov/buildingcode/library/productcontrol/noa/07052407.pdf | |
|
|
|
Clad Casemaster Picture | http://www.miamidade.gov/buildingcode/library/productcontrol/noa/07030607.pdf | |
|
|
|
Clad Casemaster Operator | http://www.miamidade.gov/buildingcode/library/productcontrol/noa/07052409.pdf | |
|
|
|
Clad Direct Glaze Polygon/Round Top | http://www.miamidade.gov/buildingcode/library/productcontrol/noa/07092401.pdf | |
|
|
|
20