8

!CAUTION

To reduce the risk of bodily injury from lifting, the following assembly steps #s 7 and 8 will require two people.

Step 7

Hood/Body To Cart Assembly

Lift the Hood/Body Assembly over the cart assembly and set it down until it rests on the top of the cart legs.

Align the holes in the side of the Body with the holes in the legs. Insert two 1/4-20 x .50 Bolts through the holes in the firebox flanges (Back Left Side View) and into threaded inserts in the inside face of the back legs. Insert two 1/4-20

x 1.50 Bolts through the holes in the front legs (Right Side View) and into threaded inserts in firebox flanges. Tighten after all are installed.

Back

Left Side View

1/4-20 x .50” Bolt set

2 pc

1/4-20 x 1.50” Bolt set

2 pc

Right Side View

Page 8
Image 8
Meco 67c3c8kk81 manual Step Hood/Body To Cart Assembly