Heavy Duty Power Equipment

Assembly

Required tools: A Philips head screw driver

Approximate assembly time: 10 minutes

1. Remove the chipper from its carton.

Remove staples, break glue on top flaps, or cut tape at carton end and peel along top flap to open carton.

2. Verify all parts are in the chipper carton.

Chipper Funnel Chipper engine

and box assembly (pre-assembled)

Chipper Chute Hardware Bag Trailer hitch and funnel handles

packaged together

3. Disconnect the spark plug wire.

Before setting up your chipper/shredder, disconnect the spark plug wire from the spark plug and ground against the engine to prevent inadvertent starting. This step should be taken as a precaution whenever you are working on this machine.

4. Attach the chipper funnel.

First, attach the two handles to the sides of the funnel using the wrench provided and a Phillips head screw driver. Tighten the nuts securely.

Second, place the funnel over the opening on the chipper box, ensuring the rubber gasket is correctly aligned. Secure the funnel with the two “swing up bolts” and the one fixed bolt using the wrench provided. Tighten the nuts securely.

5. Attach the side chipper chute.

Place the chipper chute over the four bolts protruding from the side of the chipper box and secure the nuts tightly using the wrench provided.

6. Attach the chip collection bag.

Place the metal grommets of the bag over the wire loops located at the base of the engine. Wrap the bag under the bottom of the discharge chute and pull the draw string tightly and secure it.

7. Attach the trailer hitch.

Place the trailer hitch into the socket at the base of the chipper over the axle assembly. Insert the pin and secure with the locking cotter pin.

8. Re-connect the spark plug wire.

Rev: 07/2010

Brush Master™ Chipper/Shredder with 2-Way Feed

7