TABLE OF CONTENTS
SECTION 1 (OVERVIEW)
A. Introduction to Mermaid
SECTION 2 (INSTALLATION and OPERATION)
A. Air Conditioner Installation
B. Operation
SECTION 3 (OPERATION and PROGRAMMING)
A. Digital, Programmable Thermostat
SECTION 4 (PUMP RELAY BOX)
A.Introduction
B.Installation
SECTION 5 (MAINTENANCE and WINTERIZATION)
A.Maintenance
B.Winterization
SECTION 6 (THEORY of OPERATION and TROUBLE SHOOTING)
A. Theory of Operation
B. Trouble Shooting
FIGURES:
1.Typical Ducting and Venting Scheme
2.Operational Block Diagram
3.Typical Cooling Water Installation
4a. Wiring Diagram "Cool Only" Models
4b. Wiring Diagram "Electric Heat and Cool" Models
4c. Wiring Diagram "Reverse Cycle Heat and Cool" Models
5.Typical Bleed Off Valve Installation
SECTION 1