Milan Technology MIL-S1000 user manual Removing the Modules, Installing 1000Base-SX/LX Modules

Models: MIL-S1000

1 42
Download 42 pages 21.74 Kb
Page 38
Image 38

Installing 1000Base-SX/LX Modules

a.Remove the protective plastic covers from the fiber connectors on the Module.

b.Ensure that the Switch is powered up.

c.Plug the SC connector on the fiber cable into the fiber socket on the Module.

d.Connect the other end of the fiber optic segment to an appropriate device fitted with a 1000Mbps adapter.

Check the LED indicators on the front of the Switch to ensure that the Module is operating correctly.

Removing the Modules

a. Ensure that the power supply and the backbone connection cables are disconnected from the Switch.

b.Place the Switch on a flat surface. Undo the two captive thumbscrews securing the Module into the Switch. Do not remove any other screws from the rear of the Switch.

c.If you are not installing another Module immediately, you must replace the blanking plate to ensure that dust and debris do not enter the Switch, as well as to aid circulation of cooling air.

Page 38
Image 38
Milan Technology MIL-S1000 user manual Removing the Modules, Installing 1000Base-SX/LX Modules