Miller Electric 255 warranty Installing Work Clamp, Installing Gas Supply

Models: 255

1 40
Download 40 pages 44.07 Kb
Page 11
Image 11

2-5. Installing Work Clamp

4

1 Work Cable

2 Boot

Slide boot onto work cable. Route cable out front panel opening from inside.

5

3 Negative (–) Output Terminal

Connect cable to terminal and cover connection with boot.

4 Hardware

5 Work Clamp

Route cable through clamp handle

 

1

and secure as shown.

2

 

 

Close door.

 

 

3

Tools Needed:

1/2, 3/4 in

ST-800 918-C

2-6. Installing Gas Supply

7

6

5

4

1

2

3

Tools Needed:

5/8, 1-1/8 in

1Cylinder Rack

2Chain

Obtain gas cylinder and chain cylinder to rack.

3Gas Hose Fitting

4CO2 Washer

5Regulator

Install washer and regulator onto cylinder.

6 Gas Hose Connection

Obtain gas hose with fittings and install between regulator and welding power source.

7 Flow Adjust

Typical flow rate is 20 cfh (cubic feet per hour).

ST-154 623-A / Ref. ST-109 492

OM-157 066 Page 7

Page 11
Image 11
Miller Electric 255 warranty Installing Work Clamp, Installing Gas Supply