3-8. Selecting a Location and Connecting Input Power (1-Phase and 3-Phase)

Have only qualified persons make this installation.

1 Rating Label

Supply correct input power.

18 in (457 mm) for airflow

GND/PE

L1

L2

GND/PE

L1

L2 L3

Connect First

 

 

Connect First

 

 

1-Phase Primary Connection

3-Phase Primary Connection

1

OM-223 194 Page 12

Page 16
Image 16
Miller Electric 383, 271, 293, 333, 273 manual L2 L3