Miller Electric Big 40 WG manual Installation, Installing Welding Generator See Sections 4-2

Models: Big 40 WG

1 80
Download 80 pages 63.45 Kb
Page 18
Image 18

SECTION 4 – INSTALLATION

4-1. Installing Welding Generator (See Sections 4-2 And 4-3)

Movement

Airflow Clearance

18in

(460 mm)

Location

18 in

18 in

(460 mm)

OR

(460 mm)

18 in

18 in

(460 mm)

(460 mm)

 

OR

Grounding

 

 

 

Y Always

securely

fasten

 

 

 

 

welding

 

generator

onto

 

 

 

 

 

 

 

 

 

 

 

transport vehicle

or

trailer

 

 

 

 

 

and comply with all DOT and

 

1

3

4

 

other applicable codes.

 

Y Always

ground

generator

 

 

 

 

GND/PE

 

 

 

 

 

 

 

frame to vehicle frame to pre-

 

 

 

 

 

vent electric shock and static

 

OR

 

 

 

electricity hazards.

 

 

 

 

1

Generator Base

 

 

 

 

 

 

 

 

 

 

 

 

2

Metal Vehicle Frame

 

 

 

 

 

3

Equipment Grounding

 

 

Electrically bond generator frame to

 

 

 

Terminal

 

 

 

 

 

 

 

4

Grounding Cable

 

 

 

vehicle frame by metal-to-metal

 

 

 

 

 

 

 

Use #10 AWG or larger insulated

2

contact.

 

2

 

 

 

 

copper wire.

 

 

 

 

 

 

 

 

Y If unit does not have GFCI re-

 

 

 

 

 

ceptacles,

use

 

GFCI-

 

 

 

 

 

protected extension cord.

install2 1/01 – Ref. 800 652 / Ref. 800 477-A / 158 936-A / 0854

4-2. Using Lifting Eye

 

1

Lifting Eye

1

2

Nut

3

Carriage Bolt

 

 

Raise lifting eye until it snaps in

 

place. Lower lifting eye when not

 

needed.

 

. To lock the lifting eye in the up-

 

2

right position, insert a 3/8-16 x

 

 

 

 

1-1/2 in carriage bolt through

 

 

slot in bracket and secure with

 

 

nut (bolt and nut not supplied).

3

 

Tools Needed:

Ref. 802 729

OM-4405 Page 14

Page 18
Image 18
Miller Electric Big 40 WG manual Installation, Installing Welding Generator See Sections 4-2, Using Lifting Eye