B. 3-Phase
3
4
3
6
1
Tools Needed:
=GND/PE Earth Ground
7
2
L1 |
|
L2 | 5 |
| |
L3 |
|
YInstallation must meet all National and Local Codes − have only quali- fied persons make this installation.
YDisconnect and lockout/tagout in- put power before connecting input conductors from unit.
YAlways connect green or green/ yellow conductor to supply grounding terminal first, and never to a line terminal.
For
1Input Power Cord.
2Disconnect Device (switch shown in the OFF position)
3Green Or Green/Yellow Grounding Conductor
4Disconnect Device Grounding Terminal
5Input Conductors (L1, L2 And L3)
6Disconnect Device Line Terminals
Connect green or green/yellow grounding conductor to disconnect device grounding terminal first.
Connect input conductors L1, L2, and L3 to disconnect device line terminals.
7
Select type and size of
Close and secure door on disconnect device. Remove lockout/tagout device, and place switch in the On position.
803