Monessen Hearth NB18 CLEARANCES and HEIGHT REQUIREMENTS, Shelf Or Other Combustible Projection

Models: NB18 NB24

1 40
Download 40 pages 3.07 Kb
Page 13
Image 13
8" or More of

CLEARANCES and HEIGHT REQUIREMENTS

Heat resistant material (minimum requirements) with wooden mantel or other combustible projection:

To install the heater with a wooden mantel, shelf or other combustible projection above, first measure the heat resistant mate- rial shown in Figure 6, then refer to Table B.

 

8" or More of

 

Heat Resistan

Hood

Material

 

Heater in

 

Fireplace or

 

Firebox

 

Figure 6 - Measuring Heat Resistant Material for Mantel

HEAT RESISTANT

MATERIAL

MEASUREMENT

REQUIREMENTS FOR SAFE INSTALLATION WITH WOODEN MANTEL,

SHELF OR OTHER COMBUSTIBLE PROJECTION

NB18

NB24

12" or more

Hood not required. Observe profiles (side

Hood not required. Observe profile (side

 

elevations) shown in Figure 7, page 14.

elevations) shown in Figure 9, page 15

8" to less than 12"

Install hood and observe profiles showin in

Install hood and observe profiles shown in

 

Figure 8, page 14, OR extend heat resis-

Figure 8, page 14; OR extend heat resistant

 

tant material to at least 12” and observe

material to at least 12" and observe profiles

 

profiles shown in Figure 7, page 14.

shown in Figure 9, page 15.

Less than 8"

Extend heat resistant material to at least

Extend heat resistant material to at least 8",

 

8", install hood and observe profiles shown

install hood and observe profiles shown in

 

in Figure 8, page 14; OR extend heat resis-

Figure 8, page 14, OR extend heat resistant

 

tant material to at least 12" and observe

material to at least 12" and observe profiles

 

profiles shown in Figure 7, page 14.

shown in Figure 9, page 15.

 

 

 

TABLE B - Heat Resistant Material Heights and Mantel Location

81D0107

13

Page 13
Image 13
Monessen Hearth NB18 CLEARANCES and HEIGHT REQUIREMENTS, Shelf Or Other Combustible Projection, or More of, Heat Resistan