INSTALLATION PREPARATION
FIGURE 7
SINGLE STORY INSTALLATION WITH ATTIC SPACE
NOTICE:
Chimney must be correct height above the roof or other obstruction for safety and for proper draft operation. The chimney must be at least 3 feet
SC CHIMNEY CAP
STORM COLLAR (INCLUDED WITH CAP)
FLASHING (612 OR 1212)
ATTIC SPACE
FLUE OUTLET HEIGHT
3 FT. MIN. HEIGHT, AND 2 FT. MIN. ABOVE ANY POINT WITHIN 10 FEET OF CHIMNEY.
SEE TABLE 1 FOR
ROOF OPENING
SIZE
higher than the highest point where it passes through the roof and at least 2 feet higher than the highest part of the roof or structure that is within 10 feet of the chimney, measured horizontally. See Figures 7, 9, and 14.
16FT.
MIN.
SF FIRESTOP SPACER (1 3/4" AIR SPACE CLEARENCE TO COMBUSTIBLES)
14 1/2" SQUARE OPENING IN JOIST
2" MIN. CLEARENCE | FIGURE 9 |
TO COMBUSTIBLES | |
| MULTIPLE STORY INSTALLATION |
| SC CHIMNEY CAP |
| FLUE OUTLET HEIGHT |
FIGURE 8
PREFERRED LOCATION
POOR LOCATION
STORM COLLAR (INCLUDED WITH CAP)
FLASHING (612 OR 1212)
ATTIC SPACE
14 1/2" SQUARE HOLE IN JOIST (1 3/4" AIR SPACE CLEARANCE TO COMBUSTIBLES)
*86 FT. MAX.
INSTALLATION HEIGHT
2" MIN. CLEARANCE
TO COMBUSTIBLES (TYPICAL ALL AROUND.)
14 1/2" SQUARE HOLE IN JOIST (1 3/4" AIR SPACE CLEARANCE TO COMBUSTIBLES)
3 FT. MIN. HEIGHT, AND 2 FT. MIN. ABOVE ANY POINT WITHIN 10 FEET OF CHIMNEY.
SEE TABLE
1 FOR ROOF OPENING SIZE
SF FIRESTOP
SPACER
THIRD FLOOR AREA
SF FIRESTOP
SPACER
SECOND FLOOR AREA
SF FIRESTOP
SPACER
FIRST FLOOR AREA
*: SCS CHIMNEY SUPPORT REQUIRED EVERY 30 FEET OF INSTALLATION HEIGHT.
9
53D9033. Rev 1 03/03